- 1
Brief
Day 0
- 2
Quote & mock-up
24 h
- 3
Sample
5–7 days
- 4
Production
15–25 days
- 5
Inspection
1–2 days
- 6
Shipping
5–40 days
1Prepare a complete brief#
The fastest orders start with a complete brief. Missing details lead to rounds of back-and-forth and quotes that change later. Here is exactly what our sales engineers need:
| Item | Why it matters | If you don't know yet |
|---|---|---|
| Artwork / logo | Defines print method and cost | Send a JPG; we redraw simple logos free |
| Bag size (W × H × gusset) | Drives fabric usage | See our tote bag size guide |
| Fabric & weight | Largest cost component | We'll suggest 10 or 12 oz canvas |
| Handles & closure | Affects labour and trims | Self-fabric handles, open top |
| Quantity | Unit price tiers | Give 2–3 quantities to compare |
| Delivery date & address | Determines shipping method | Your event or launch date |
2Get the quote and digital mock-up#
Within 24 hours you should receive a quotation with price tiers, the sample fee and time, and a digital mock-up showing your artwork on the bag at real scale. Check the print size and position carefully — this is the cheapest moment to change anything.
- Fabric weight stated in g/m², not just "canvas".
- Print method and number of colours listed separately.
- Packaging included (individual polybag? carton size?).
- Incoterm clearly stated (EXW, FOB Guangzhou/Shenzhen, CIF, DDP).
3Approve a physical sample#
Sample stage- One bag made by hand in our sample room
- You check size, colour, print and stitching
- Changes are cheap and fast
Bulk stage- Thousands of bags on the sewing line
- Every bag must match the approved sample
- Changes now cost time and money
A pre-production sample normally takes 5–7 days plus express shipping. Test it like your customers will: fill it, carry it, wash it if needed. When you approve, keep one sample yourself — it is the reference for inspection.
4Confirm the order and production#
Most factories, including ours, work with a 30% deposit to start production and 70% balance before shipping. Production of a standard canvas tote takes 15–25 days depending on quantity, printing and accessories.
- 1
Fabric purchasing & inspection
Days 1–4Canvas is bought or dyed to your colour and checked for weight, shade and defects.
- 2
Cutting & printing
Days 5–10Panels are cut to the pattern and printed; first pieces are compared with the sample.
- 3
Sewing & assembly
Days 11–17Handles, seams, gussets, labels and closures are sewn on the production line.
- 4
Finishing & packing
Days 18–20Threads are trimmed, bags are inspected, folded, polybagged and packed into cartons.
Video
Watch: attaching handles during bulk production
Handle attachment is the most critical sewing step for strength — we check it inline on every batch.
5Quality inspection before shipping#
Before the balance payment, the goods are inspected. Many buyers use an AQL sampling plan — a statistical method that decides how many bags to check and how many defects are acceptable. A common setting for promotional bags is General Inspection Level II with AQL 2.5 for major defects.
| Check | Typical standard |
|---|---|
| Measurements | Within ±1 cm of the specification |
| Correct position, colour matches sample, no smudges or cracks | |
| Stitching | Even density, no skipped stitches, handles reinforced |
| Cleanliness | No stains, loose threads or chalk marks |
| Packing | Correct quantity per carton, carton marks, barcodes if required |

6Choose shipping and Incoterms#
The Incoterms® rules published by the International Chamber of Commerce define who pays for freight, insurance and import duty. Compare quotes on the same Incoterm, otherwise you are comparing different things.
| Term | Factory pays until… | Good for |
|---|---|---|
| EXW | Goods ready at the factory | Buyers with their own forwarder in China |
| FOB | Goods loaded on the vessel at the Chinese port | Sea freight with your own forwarder |
| CIF | Freight and insurance to your port | Buyers who handle import themselves |
| DDP | Delivered to your door, duties paid | Small and first-time importers |
- Express (DHL / UPS / FedEx)
- 5–8 days
- Air freight to airport
- 7–12 days
- Sea freight, port to port
- 20–40 days
- Plan ahead door-to-door by sea
- 6–10 weeks
Your customs broker will need the product's Harmonized System (HS) code. Textile shopping bags are usually classified under heading 4202 — confirm the exact code with your broker before shipping.
7After delivery: reorders get faster#
Once your bag is in our system, reorders skip the sampling stage. Keep your approved sample and order number — a repeat order with the same artwork usually ships 3–5 days faster. To estimate your budget in advance, read our cost guide.



